R6 risk condition have high probability and low impact.In this case, the delay of transportation is common risk in the visit trip, because Seoul have many traffic jam condition in the large city.Even there are high risk to be incurred, it will not be a big problem.The guide can arrange other faster transport to continue ours schedule immediately.
R2 R3 R4 risk condition have medium probability and medium impact.These risks are happen during the visit trip sometime.Even though we had prepared for these,for example check the weathers before one week age,remind the student be careful with belongings.The accident can also happen and uncontrollable.So,the probability is medium.Although these risk don't stop the schedule directly,it waste a little of time to handle the trouble.For example,if anyone lost the belongings,the whole team cannot move to next place.It need some to search or report missing as serious case.In short, these risk can prevent the schedule continue in medium probability.
R5 risk condition have low probability and high impact.This condition is extreme risk if it is incurred.Because if anyone get lost in the free time without contact, it need a lot of time and manpower to search.So the following schedule must be stop to prevent more loss unit find out the loss of students.The whole team will not continue the everts and destroy the original planning.It is not easy to turn back to the right track.However, it is low probability to happen.Because we reminded the student should not be alone and notify students stay in limited area.So, even students get lost, it can be easy for searching.This extreme risk is low probability.
Recommendation and Conclusion
To conclude,there are many risks can be incurred in the visit.The most important thing is that identify the threat and stopped the damage immediately to minimum the potential losses.For example, if the team leader identify the weather is bad, he must assess the risk should be accept or not.May be he can continue the schedule with umbrella or return to the hotel.In this trip, it don't have a high probability and high impact risk.I analysis that it may be we have done well preparing before the visit trip start.So, even there are high impact risk, it just have low or medium probability.The student's safety is the main consideration in the Seoul trip.
...