Essays.club - Get Free Essays and Term Papers
Search

Msc - Malaysia Cybercenter Design Standards

Autor:   •  March 29, 2018  •  1,447 Words (6 Pages)  •  477 Views

Page 1 of 6

...

1.4 Service Availability – Performance Guarantees

(Responsible Parties: Telcos, ISPs, Resellers)

No.

Performance Parameters

Performance Standard

Supporting Documents

Compliance

(Y/N)

Remarks

1.4.1

Minimum service availability for all services per month

99.9 %

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

1.5 Service Restoration – Performance Guarantees

(Responsible Parties: Telcos, ISPs, Resellers)

No.

Performance Parameters

Performance Standard

Supporting Documents

Compliance

(Y/N)

Remarks

1.5.1

Maximum fault report acknowledgement

1 hours

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

1.5.2

Maximum fault restoration

4 hours

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

1.6 Billing and Network Management – Performance Guarantees

(Responsible Parties: Telcos, ISPs, Resellers)

No.

Performance Parameters

Performance Standard

Supporting Documents

Compliance

(Y/N)

Remarks

1.6.1

Maximum reconfiguration of switched services

7 days

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

1.6.2

Consolidated bill for all services

Monthly

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

1.6.3

Maximum bill dispute resolution

1 month

Letter of Commitment / Publication Brochure or SLA

MSPSB to advise

[pic 4]

2.1 Infrastructure

(Responsible Parties : CCM / Building Owners)

No.

Performance Parameters

Performance Standard

Supporting Documents

Compliance

(Y/N)

Remarks

Option 1*

2.1.1*

Availability of redundant power supply to enterprise building or site from Electricity Provider

Available

Electric Supply Schematic Diagram

Yes

Will seek commitment letter from Wirazone

Availability of Automatic Transfer Switch (ATS) from primary electricity supply to secondary supply

Available

Installation Record

Yes

Option 2**

2.1.2**

Availability of 100% load generator set back up to enterprise buildings from building owner

Available

Design and Installation Record

Not applicable

Availability of Automatic Transfer Switch (ATS) from electricity supply (Primary or Secondary) to generator set

Available

Installation Record

Not applicable

2.2 Operation and Maintenance

(Responsible Parties : CCM / Building Owners)

No.

Performance Parameters

Performance Standard

Supporting Documents

Compliance

(Y/N)

Remarks

2.2.1

Maximum no of power interruptions per year

Documented monthly faults and scheduled outages report

To be advised by Wirazone

2.2.2

Maximum

...

Download:   txt (13.4 Kb)   pdf (72.5 Kb)   docx (27.7 Kb)  
Continue for 5 more pages »
Only available on Essays.club