Traffic Count Survey in the Area of the Methanol Factory Site
Autor: Sara17 • December 29, 2017 • 885 Words (4 Pages) • 510 Views
...
Graph 1 : Traffic data collected at Site A for light cars.
[pic 11]
---------------------------------------------------------------
Graph 2 : Traffic data collected at Site A for heavy trucks.
[pic 12]
As indicated in Table 1, Graph 1 and 2 the maximum number of light vehicles passing in one hour through site A were 68, during the time period of 7:00 to 8:00 o’clock. The maximum number of heavy trucks in one hour was observed on site A during the period 7:00 and 8:00 o’clock, 89 heavy trucks were recorded during this hour. It has been observed that during the morning period there is an increase in the traffic density because the roadway is used by trucks that transfer raw material to the cement factory or visit the factory for loading cement.
Table 2 : Traffic data collected at Site B.
Time
Lanes / Number of light vehicles
Lanes / Number of heavy vehicles
i
ii
III
IV
i
ii
III
IV
6:00-7:00
2
4
1
5
3
5
0
1
7:00-8:00
21
31
3
2
14
19
0
2
8:00-9:00
17
26
3
3
12
14
0
1
9:00-10:00
15
24
2
4
9
13
0
0
10:00-11:00
18
24
2
2
6
14
1
0
11:00-12:00
21
26
0
2
9
12
2
0
12:00-13:00
13
31
0
3
6
11
0
0
13:00-14:00
10
23
2
3
11
14
0
0
14:00-15:00
11
24
2
2
6
11
1
0
15:00-16:00
18
22
1
1
4
7
0
0
16:00-17:00
19
37
0
2
3
5
1
0
17:00-18:00
17
19
1
2
2
1
2
0
Total light vehicles
182
291
17
...